Coverart for item
The Resource Liquidated damages and extensions of time in construction contracts, Brian Eggleston

Liquidated damages and extensions of time in construction contracts, Brian Eggleston

Label
Liquidated damages and extensions of time in construction contracts
Title
Liquidated damages and extensions of time in construction contracts
Statement of responsibility
Brian Eggleston
Creator
Subject
Language
eng
Cataloging source
DLC
http://library.link/vocab/creatorName
Eggleston, Brian
Index
index present
LC call number
KD1641
LC item number
.E34 2009
Literary form
non fiction
Nature of contents
bibliography
http://library.link/vocab/subjectName
  • Construction contracts
  • Performance (Law)
  • Breach of contract
  • Damages
  • Time (Law)
  • Construction contracts
  • Performance (Law)
  • Breach of contract
  • Damages
  • Time (Law)
Label
Liquidated damages and extensions of time in construction contracts, Brian Eggleston
Instantiates
Publication
Bibliography note
Includes bibliographical references and index
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Dimensions
25 cm
Edition
Third edition.
Extent
viii, 394 pages
Isbn
9781405118156
Isbn Type
(hardback)
Lccn
2008044760
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
System control number
(OCoLC)318196046
Label
Liquidated damages and extensions of time in construction contracts, Brian Eggleston
Publication
Bibliography note
Includes bibliographical references and index
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Dimensions
25 cm
Edition
Third edition.
Extent
viii, 394 pages
Isbn
9781405118156
Isbn Type
(hardback)
Lccn
2008044760
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
System control number
(OCoLC)318196046

Library Locations

    • Biddle Law LibraryBorrow it
      3400 Chestnut Street, Philadelphia, Pennsylvania, 19104, US
      39.954941 -75.193362
Processing Feedback ...