Coverart for item
The Resource Construction delay claims, Barry B. Bramble, Michael T. Callahan

Construction delay claims, Barry B. Bramble, Michael T. Callahan

Label
Construction delay claims
Title
Construction delay claims
Statement of responsibility
Barry B. Bramble, Michael T. Callahan
Creator
Contributor
Subject
Language
eng
Member of
http://library.link/vocab/creatorName
Bramble, Barry B
Illustrations
illustrations
Index
index present
Literary form
non fiction
Nature of contents
bibliography
http://library.link/vocab/relatedWorkOrContributorName
Callahan, Michael T
Series statement
Construction law library
http://library.link/vocab/subjectName
  • Construction contracts
  • Construction industry
  • Liability (Law)
Label
Construction delay claims, Barry B. Bramble, Michael T. Callahan
Instantiates
Publication
Copyright
Note
  • "Wiley law publications."
  • Includes indexes
Bibliography note
Bibliography: p. 338
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Dimensions
26 cm.
Extent
xix, 379 pages
Isbn
9780471011125
Lccn
86026772
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
Other physical details
illustrations
System control number
  • (CaOTULAS)182638768
  • 87-B2283
Label
Construction delay claims, Barry B. Bramble, Michael T. Callahan
Publication
Copyright
Note
  • "Wiley law publications."
  • Includes indexes
Bibliography note
Bibliography: p. 338
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Dimensions
26 cm.
Extent
xix, 379 pages
Isbn
9780471011125
Lccn
86026772
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
Other physical details
illustrations
System control number
  • (CaOTULAS)182638768
  • 87-B2283

Library Locations

    • Biddle Law LibraryBorrow it
      3400 Chestnut Street, Philadelphia, Pennsylvania, 19104, US
      39.954941 -75.193362
Processing Feedback ...