Coverart for item
The Resource Authorizing extension of time limitation for a FERC-issued hydroelectric license : report (to accompany H.R. 1014)

Authorizing extension of time limitation for a FERC-issued hydroelectric license : report (to accompany H.R. 1014)

Label
Authorizing extension of time limitation for a FERC-issued hydroelectric license : report (to accompany H.R. 1014)
Title
Authorizing extension of time limitation for a FERC-issued hydroelectric license
Title remainder
report (to accompany H.R. 1014)
Creator
Subject
Language
eng
Member of
Cataloging source
GPO
Government publication
federal national government publication
Index
no index present
Literary form
non fiction
http://bibfra.me/vocab/lite/organizationName
United States
Series statement
Report / 104th Congress, 2d session, Senate
Series volume
104-313
http://library.link/vocab/subjectName
  • United States
  • Hydroelectric power plants
  • Hydroelectric power plants
Label
Authorizing extension of time limitation for a FERC-issued hydroelectric license : report (to accompany H.R. 1014)
Instantiates
Publication
Note
  • CIS Microfiche Accession Numbers: CIS 96 S313-23
  • Caption title
  • "June 28, 1996."
  • Reuse of record except for individual research requires license from Congressional Information Service, Inc
Base of film
safety base undetermined
Carrier category
microfiche
Carrier category code
  • he
Carrier MARC source
rdacarrier
Color
black and white
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Dimensions
24 cm.
Dimensions
4x6 in. or 11x15 cm.
Emulsion on film
silver halide
Extent
3 pages
Form of item
microfiche
Generation
service copy
Media category
microform
Media MARC source
rdamedia
Media type code
  • h
Positive negative aspect
negative
http://bibfra.me/vocab/marc/reductionRatio
02
ReductionRatioRange
normal reduction
Reproduction note
Microfiche.
Specific material designation
microfiche
System control number
  • gp 96076151
  • (OCoLC)35194285
Label
Authorizing extension of time limitation for a FERC-issued hydroelectric license : report (to accompany H.R. 1014)
Publication
Note
  • CIS Microfiche Accession Numbers: CIS 96 S313-23
  • Caption title
  • "June 28, 1996."
  • Reuse of record except for individual research requires license from Congressional Information Service, Inc
Base of film
safety base undetermined
Carrier category
microfiche
Carrier category code
  • he
Carrier MARC source
rdacarrier
Color
black and white
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Dimensions
24 cm.
Dimensions
4x6 in. or 11x15 cm.
Emulsion on film
silver halide
Extent
3 pages
Form of item
microfiche
Generation
service copy
Media category
microform
Media MARC source
rdamedia
Media type code
  • h
Positive negative aspect
negative
http://bibfra.me/vocab/marc/reductionRatio
02
ReductionRatioRange
normal reduction
Reproduction note
Microfiche.
Specific material designation
microfiche
System control number
  • gp 96076151
  • (OCoLC)35194285

Library Locations

    • Biddle Law LibraryBorrow it
      3400 Chestnut Street, Philadelphia, Pennsylvania, 19104, US
      39.954941 -75.193362
Processing Feedback ...