Coverart for item
The Resource Advanced concepts in construction delay & disruption disputes

Advanced concepts in construction delay & disruption disputes

Label
Advanced concepts in construction delay & disruption disputes
Title
Advanced concepts in construction delay & disruption disputes
Title variation
Construction delay and disruption disputes
Contributor
Subject
Language
eng
Member of
Cataloging source
PPT-L
Illustrations
illustrations
Index
no index present
Literary form
non fiction
http://library.link/vocab/relatedWorkOrContributorName
Pennsylvania Bar Institute
Series statement
PBI
Series volume
no. 2004-3820
http://library.link/vocab/subjectName
  • Construction contracts
  • Public contracts
  • Breach of contract
Label
Advanced concepts in construction delay & disruption disputes
Instantiates
Publication
Copyright
Carrier category
volume
Carrier category code
  • nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Dimensions
28 cm.
Extent
xi, 170 pages
Lccn
2004095086
Media category
unmediated
Media MARC source
rdamedia
Media type code
  • n
Other physical details
illustrations
System control number
04-B3161
Label
Advanced concepts in construction delay & disruption disputes
Publication
Copyright
Carrier category
volume
Carrier category code
  • nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Dimensions
28 cm.
Extent
xi, 170 pages
Lccn
2004095086
Media category
unmediated
Media MARC source
rdamedia
Media type code
  • n
Other physical details
illustrations
System control number
04-B3161

Library Locations

    • Biddle Law LibraryBorrow it
      3400 Chestnut Street, Philadelphia, Pennsylvania, 19104, US
      39.954941 -75.193362
Processing Feedback ...